Reducing motorists inconvenience due to maintenance operations on high-volume freeways.

Author(s)
Forbes, C.E. J.H. Smith & W.E. Schaefer.
Year
Abstract

Mudjacking operations along the San Diego Freeway required that concrete slobs be placed in two-lane sections. The scheduling and traffic-control practices employed to minimize delay during this three-month task are described.