A report on the performance of the concrete median barrier on the Harbor Freeway.

Author(s)
-
Year
Abstract

In may 1969 a concrete barrier was completed on the Harbor Freeway. This barrier, along with a six and one-half mile section of metal beam barrier replaced a cable chain link barrier. An evaluation of one year's performance of the concrete barrier is presented. Accident and maintenance experience of the barrier is discussed.

Request publication

4 + 12 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 1184 fo /85.1/
Source

Sacramento, State of California, Department of Public Works, 1971, 11 p., fig., tab.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.