Research pays off: high-capacity piles: confirming the viability of cost-efficient bridge designs.

Author(s)
Liebich, B.A.
Year
Abstract

On many bridge projects, the California Department of Transportation has achieved substantial cost savings and has reduced construction time by using large-diameter, high-capacity piles. This was possible because of research that developed a new 8,000,000-pound pile load test system. Details on this system and the benefits that have been realized are provided in this article.