Retrofitting of flyovers along major thoroughfares in metro Manila.

Author(s)
Lazaro, A. TUANO Fabro, A. & Rapirap, R.
Year
Abstract

The retrofitting of flyovers along major thoroughfares in Metro Manila was carried out by Angel Lazaro and Associates, Consulting Engineers and Architects, as part of the Sixth ADB Highway Project, Bridge Retrofitting Component, of the Department of Public Works and Highways (DPWH) of the Philippines. The retrofitting works were implemented between 1994 up to the present. The Bridge Retrofitting Component included the design and construction of a total of 174 bridges located in various parts of the country, many of which are standard rural highway bridges. T his paper describes the retrofitting process applied to the eleven major structures in Metro Manila comprising the project. (a) For the covering entry of this conference, please see ITRD abstract no. E214938.

Request publication

14 + 5 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
C 46624 (In: C 46558 CD-ROM) /21 /24 / ITRD E214967
Source

In: On the road to the future : 12th REAAA conference, Philippines, 2006 technical papers, Philippine International Convention Center (PICC), Manila, November 20-24, 2006, 28 p.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.