A road needs study : the national primary routes.

Author(s)
Devlin, J. McCarth, C. & McGuinness, P.
Year
Abstract

Projections are made of future traffic flows the National Primary Route Network for the years 1985 and 1995 in Ireland. The effect of applying capacity criteria for three different levels of service is examined for specifications. Design hour operating speeds, overall travel time and construction costs are deduced for each alternative and these and other details are set out an graphs, tables and maps.

Request publication

1 + 15 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 8843 /10/20/
Source

Dublin, The National Institute for Physical Planning and Construction Research, 1974., 74 p., fig., graph., tab., ref.; An Foras Forbartha Teoranta RT-126

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.