State Department of Transportation management techniques for materials and construction acceptance.

Author(s)
Smith, G.R.
Year
Abstract

This synthesis will be of interest to state DOT materials and construction engineers; contract, procedure, and specification specialists; construction personnel managers; researchers; and private consultants. The synthesis describes the current state of the practice of state DOT management techniques for materials and construction acceptance, including approaches to inspection and testing. The associated requirements for maintaining adequate qualified personnel to operate the acceptance and testing programs are considered in the information reported. The information was collected by surveying state DOTs and by conducting a literature search. Administrators, engineers, and researchers are continually faced with highway problems on which much information exists, either in the form of reports or in terms of undocumented experience and practice. Unfortunately, this information often is scattered and unevaluated and, as a consequence. in seeking solutions, full information on what has been learned about a problem frequently is not assembled. Costly research findings may go unused. valuable experience may be overlooked, and full consideration may not be given to available practices for solving or alleviating the problem. In an effort to correct this situation, a continuing NCHRP project, carried out by the Transportation Research Board as the research agency, has the objective of reporting on common highway problems and synthesising available information. The synthesis reports from this endeavour constitute an NCHRP publication series in which various forms of relevant information are assembled into single, concise documents pertaining to specific highway problems or sets of closely related problems. This report of the Transportation Research Board presents background information on the changing role of specifications, quality assurance processes, warranties, material certifications, and personnel management regarding the state of the practice for state DOT management techniques for materials and construction acceptance. In addition, detailed information is presented on personnel issues. The details of materials test methods and statistical quality control procedures are not included in the report. However, discussion of these technical aspects of materials and construction acceptance are included on the basis of their influence on personnel training requirements, and changes in administrative requirements. To develop this synthesis in a comprehensive manner and to ensure inclusion of significant knowledge, the Board analysed available information assembled from numerous sources, including a large number of state highway and transportation departments. A topic panel of experts in the subject area was established to guide the research in organising and evaluating the collected data, and to review the final synthesis report. This synthesis is an immediately useful document that records the practices that were acceptable within the limitations of the knowledge available at the time of its preparation. As the processes of advancement continue, new knowledge can be expected to be added to that now at hand. (A)

Publication

Library number
982145 ST [electronic version only]
Source

Washington, D.C., National Research Council NRC, Transportation Research Board TRB / National Academy Press, 1998, 51 p., 26 ref.; National Cooperative Highway Research Program NCHRP, Synthesis of Highway Practice ; Report 263 / NCHRP Project 20-5 FY 1996 (Topic 27-05) - ISSN 0547-5570 / ISBN 0-309-06817-7

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.