Time-dependent transport network design under cost-recovery.

Author(s)
Lo, H.K. & Szeto, W.Y.
Year
Abstract

Transport infrastructure projects typically take place over a long time span. They will take a few years to plan and construct, and will last decades into the future. Moreover, revenue collection (from tolls) and investments in infrastructure improvement accrue over time. It is, therefore, crucial to determine the optimal project initiation time, phasing, scaling, toll collection strategies, and financial arrangements over the planning horizon. This paper considers the time dimension in the continuous network design problem and focuses on analyzing the aspect of cost-recovery. We develop a flexible framework under two principles of cost-recovery as a single-level optimization program, solve it through the generalized reduced gradient algorithm, and illustrate through numerical examples three considerations: namely, (i) time-dependent demands and gradual network improvements,(ii) comparison between the two cost-recovery principles, and (iii) spatial equity issues from the perspective of consumer surplus. Moreover, this study proves that Mohring and Harwitz's self-financing result for a singlefacility in a static framework can be extended to the time-dependent network design problem under the same set of assumptions. (A) Reprinted with permission from Elsevier.

Request publication

4 + 10 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
I E140246 /71 / ITRD E140246
Source

Transportation Research, Part B. 2009 /01. 43(1) Pp142-158 (33 Refs.)

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.