Toekomstige technische ontwikkelingen in verkeer en vervoer. Rapport 6, werkgroep wegen. Deelrapport No. 7g, uitgebracht in het kader van de Integrale Verkeers- en Vervoerstudie ten behoeve van het Ministerie van Verkeer en Waterstaat.

Author(s)
-
Year
Abstract

Specifications used by the construction of the R. W. 28 (Amersfoort- Zwolle) are presented. The capacity of the road, the safety, the junctions, recreational aspects, the prevention of noise pollution are taken into account.

Request publication

15 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
A 9994 /21 /
Source

Rotterdam, Stichting Het Nederlands Economisch Instituut, Afdeling Transport, Economisch Onderzoek, 1969, 22 p.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.