Two devices for improving road traffic.

Author(s)
Stora, G.
Year
Abstract

Details are given of a new Jersey movable concrete barrier which can be moved from lane to lane at a speed of 8 to 12 mph. It can be used to operate tidal traffic or protect roadworks'sites from traffic. It was successfully tested at a roadworks'site in France North of Paris in 1984. Successfull impact tests were carried out in Australia. Costs are quoted.

Request publication

4 + 3 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 29546 (In: B 29501S) /85 / IRRD 806834
Source

In: Proceedings of the 15th International Study Week in Traffic Engineering and Safety, Venice, 23- 28 September, 1985, 4 p.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.