Urgentieprogramma's en kosten-baten analyse als hulpmiddelen bij de beslissingsvoorbereiding met betrekking tot investeringen in veiligheidsvoorzieningen op spoorwegovergangen.

Author(s)
Roorda, C.
Year
Abstract

A model is developed by which for a certain region or for the whole Netherlands a priority schema can be made for the eventual substitution of railroad crossing safety measures; a priority scheme that the application of cost benefit analyses promotes.

Request publication

1 + 0 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 3587 /10.2/
Source

Utrecht, Nederlandse Spoorwegen, 1973, 71 p., tab., ref.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.