Utility problems in the design and construction of urban highways.

Author(s)
Suloway, M.
Year
Abstract

The role of the Board of Underground Work of Public Utilities of Chicago in the construction planning of the Chicago subway is described. The Board acts as a clearinghouse for information on the location of utilities. Underground utility relocation's are co-ordinated through the Board.

Request publication

4 + 0 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 539 (In: B 536) /54 IRRD 201707
Source

In: Highway Research Record (1971) no. 372., p. 11- 24 Presented at the 50th HRB annual meeting, January 1971.

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.