Vernieuwing van de stationsomgeving in Apeldoorn.

Author(s)
Golstein, H.M.
Year
Abstract

The planned reconstruction is described. It is necessary to build a new urban traffic artery, which opens the possibility for a wider infrastructural reconstruction around the station. Public transport can be improved this way by better connections. New environmental planning will also take place.

Request publication

18 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 28686 (In: B 28651 [electronic version only]) /21 / IRRD 821571
Source

In: Verkeerskundige Werkdagen, Ede, 24-25 mei 1989, p. 459-466

Our collection

This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.