Abstract
Evaluation studies are mainly done for obtaining knowledge as regards the effect of a taken measure in traffic engineering has had on specific aspects. If such studies will have optimum effect on the aims of the measures must be determined before. The system used in the evaluation of the design of the demonstration cycle tracks is given as an example.