Voor-studie rotonde Oss : samengevatte resultaten. In opdracht van de Stichting Wetenschappelijk Onderzoek Verkeersveiligheid SWOV.

Author(s)
VIA Verkeersadvisering
Year
Abstract

In order of the SWOV a before study is made on a priority- junction which will be reconstructed in a roundabout. Results of this before study are presented for traffic intensity, speed, conflict observations, waiting- time, passage- time and priority observations.

Request publication

18 + 1 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.

Publication

Library number
B 30331 /21 /73 /82 /
Source

Vught, VIA Verkeersadvisering, 1989, 14 p. + app.; SW81-RO2

SWOV publication

This is a publication by SWOV, or that SWOV has contributed to.