Abstract
The construction of an experimental prestressed road section 360 m. in length is described. A special joint structure, having a bottom slab with a raised ridge was used.
The construction of an experimental prestressed road section 360 m. in length is described. A special joint structure, having a bottom slab with a raised ridge was used.
Cement, Vol. 20 (1968), september, p. 368
This publication is one of our other publications, and part of our extensive collection of road safety literature, that also includes the SWOV publications.