Accelerating highway bridge demolition - an innovative approach.

Auteur(s)
Martin, C. & Does, J.P.
Jaar
Samenvatting

The Regional Municipality of York used a unique approach to construction staging for a new interchange at Highway 404 and Elgin Mills Road, which included the demolition of the existing two-span post-tensioned concrete bridge structure over the expressway within a single 12-hour night-time highway closure. A highway closure was arranged to perform the bridge demolition from Saturday, December 13, 2003 at 10:00 p.m. to Sunday, December 14, 2003 at 10:00 a.m. so that the bridge could be demolished. As a result, traffic on Elgin Mills Road and on Highway 404 was impacted for only twelve hours of the entire two-year construction period. For the covering abstract of this conference see ITRD number E211426.

Publicatie aanvragen

13 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 42699 (In: C 42681 CD-ROM) /50 /53 /73 / ITRD E211444
Uitgave

In: Transportation : investing in our future : proceedings of the 2005 annual conference and exhibition of the Transportation Association of Canada TAC, Calgary, Alberta, Canada, September 18-21, 2005, 14 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.