Alternative contracting practices for transportation infrastructure.

Auteur(s)
Martin, B.W.
Jaar
Samenvatting

Building a new tunnel to accomodate CN North America's needs for double stacked container traffic for the next 100 years presented new and unprecedented challenges. Innovative approaches to contracting, especially the Negotiated Compressed Process (NCP), TBM design, project management, and the regulatory and approval process, were all required to deliver a new tunnel to meet the needs of CN North America within the approved completion schedule of 33 months compared to a traditional approach of 45 to 48 months. The NCP resulted in trimming a minimum of twelve months from the project schedule, at a great saving of direct and indirect costs. The Negotiated Compressed Process is an innovative formalized approach to risk innovative formalized approach to risk sharing for complex infrastructure projects. Ads were placed in the international trade journals and a short list of "approved" contractors and suppliers was developed. The approval process for this international project involved contacts with over two hundred agencies, departments and interested stakeholders. (A)

Publicatie aanvragen

4 + 1 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 4664 (In: C 4638 b) /10 /54 / IRRD 854105
Uitgave

In: Transportation and national prosperity : proceedings of the 1993 Transportation Association of Canada TAC annual conference, Ottawa, September 19-22, 1993, Volume 2, p. D71-D81

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.