Application of incremental benefit-cost analysis for optimal budget allocation to maintenance, rehabilitation, and replacement of bridges.

Auteur(s)
Farid, F. Johnston, D.W. Levarde, M.A. & Chen, C.-J.
Jaar
Samenvatting

Bridge improvement funding in the United States has been insufficient for years. Thus, a systematic algorithm for efficient allocation of limited budgets to deficient bridges is needed, as part of a comprehensive bridge management system. Application of one such algorithm, the Incremental Benefit-Cost (INCBEN) program, for optimal allocation of the limited budgets to bridge improvement alternatives at the system level is investigated. INCBEN is applied to a sample of highway bridges to determine a near-optimal set of improvement alternatives. The sample consists of 25 in-service bridges in North Carolina with varying structural or functional deficiencies. Selection of the near-optimal bridge improvement alternatives under several levels of budget granted; sensitivity of budget-allocation results to the discount rate, remaining life, and service life; and comparison of results with those of the sufficiency rating methods are described. (Author/publisher)

Publicatie aanvragen

2 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 18754 (In: C 18752 S) /10 /53 / IRRD 869649
Uitgave

In: Maintenance of the highway infrastructure, Transportation Research Record TRR 1442, p. 88-100, 3 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.