Behaviour during construction of a propped diaphragm wall founded in London clay at Aldershot Road underpass. Prepared for the Highways Agency, Bridges Engineering Division.

Auteur(s)
Carder, D.R. Press, D.J. Morley, C.H. & Alderman, G.H.
Jaar
Samenvatting

Field instrumentation has been installed to monitor the behaviour of a T-shaped diaphragm retaining wall founded in overconsolidated clay during and immediately after its construction as part of the Aldershot Road underpass. The construction sequence involved installation of the wall under bentonite followed by excavation below two levels of temporary props and casting of a permanent reinforced concrete prop slab below the final carriageway level. The permanent prop slab was designed to restrict long term swelling pressures of the clay and constructed as a shallow V-shape with hinges at each wall and in the centre. Measurements of ground movements, wall movements and bending moments, temporary and permanent prop moments, temporary and permanent prop loads, and heave pressures and porewater pressures below the carriageway slab were made during the various construction stages. (A)

Publicatie

Bibliotheeknummer
C 8411 [electronic version only] /24 /53 / IRRD 887258
Uitgave

Crowthorne, Berkshire, Transport Research Laboratory TRL, 1997, 30 p., 12 ref.; Project Reference ; E467A/BG / TRL Report ; No. 239 - ISSN 0968-4107

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.