Bridges on the Trans Labrador Highway.

Auteur(s)
Jin, G. Lester, P. & McCarthy, T.
Jaar
Samenvatting

In 1983, the Province of Newfoundland and Labrador started construction of the Trans Labrador Highway (TLH). Upgrading and new construction was undertaken in three phases starting in 1997. Phase II (Red Bay to Cartwright), a 325 km all-weather gravel highway passing through uninhabited and undeveloped wilderness country, is intersected by 150 watercourses, ranging from small streams to large rivers (Alexis and St. Lewis). These two large rivers created difficult challenges for the planning and design of the 110 m single span truss bridges, including site optimization, road travel minimization and maintenance through mountainous terrain and/or traversing deep tidal inlets. Environmental considerations using survey data from 1823 hydrometric surveys (depth soundings) were employed along with a hydrological/hydraulic study (tidal effects), as well as river and ocean ice concerns. Bridge structures over the Alexis and St. Lewis Rivers consisted of steel truss designs with steel grid deck and reinforced concrete abutments. Problems encountered included route layout and selection, geoscience considerations, hydrology, hydraulics, causeway construction, bridge launching and environmental issues. Weak clayey silts had to sustain a load of up to a 30 m high causeway at the abutments.

Publicatie aanvragen

8 + 11 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 36434 (In: C 36376 CD-ROM) /24 /53/ ITRD E211324
Uitgave

In: The transportation factor : proceedings of the 2003 annual conference and exhibition of the Transportation Association of Canada TAC, St. John's, Newfoundland and Labrador, Canada, September 21-24, 2003, 21 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.