The can of worms untangled.

Auteur(s)
Gurley, L.M.
Jaar
Samenvatting

An account is given of part of the `Rebuild New York' project which involved the extensive repair of a complex interchange known as the `Can of Worms'. The approach taken was to divert traffic both by constructing alternative routes and by diverting traffic to park and ride and car pooling schemes. Details are given of the considerable amount of public relations work involved in the scheme. The reconstruction work, which involved replacing or repairing 16 bridges and replacing a deteriorating pavement, was managed using the Critical Path Method. The advantages of using this method are described. Another useful project management technique was the use of a scale model. Project management software used on the contract is also described.

Publicatie aanvragen

7 + 8 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 5554 (In: C 5542) /10 /21 / IRRD 869166
Uitgave

In: Highways : proceedings of seminar K (P382) held at the 22th PTRC European Transport and Planning Summer Annual Meeting, University of Warwick, England, September 12-16, 1994, p. 135-144

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.