This paper will be the case study of two trial installations of a Fabric Reinforced Surface Treatment. The first site was installed by the Manitoba Department of Highways in 1992, located on a rural Heritage Highway, north of Winnipeg, Manitoba. The second site, installed by the Municipal District of Clearwater in 1993, is located on Airport Road near Rocky Mountain House, Alberta. Site preparation, materials used, and installation methods will be detailed, as well as performance review for each site. (A)
Samenvatting