Case study : performance effects of changing a traffic signal intersection to roundabout.

Auteur(s)
Hoeglund, P.G.
Jaar
Samenvatting

In order to study the possible positive effects of changing a traffic signal intersection to a roundabout, a survey was performed during autumn 1989 and spring 1990. The intersection has a central downtown location in the city of Joenkoeping, Sweden. The survey was done as a before- after- study and is primarily concentrating on differences in the vehicle time consumption when driving through the intersection. The survey is an integrated part and a case study within a larger research project aiming to create a Method and Model for Comparative Intersection Research. The research methodology is based on the use of video pictures taken from the air (helicopter) or from a high located observation point. A special computer program has been developed for facilitating the data evaluation process, giving a descriptive presentation of relevant traffic flow parameters. The study gave very positive performance results for the roundabout compared to the traffic signal intersection, and the time saving was remarkable.

Publicatie aanvragen

1 + 7 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 903 (In: C 892) /72 /71 /21 / IRRD 852371
Uitgave

In: Intersections without traffic signals II : proceedings of an International Workshop, Bochum, Germany, 18-19 July 1991, p. 141-158, 28 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.