The Channel Tunnel : 1751-1975.

Auteur(s)
Davidson, F.P.
Jaar
Samenvatting

The history is reviewed on research and preparation of the channel tunnel. A description is given of studies carried out in recent years, concluding with some comments on the implications, for the engineering profession, of the financing by private means of a project which had been thought to be of such magnitude that it had to be accomplished on a governmental basis. Valid routes have been delineated for either a bored tunnel that would be embedded in the lower chalk, or an immersed tube laid in a trench dredged in the sea bed. The decision as to the type of construction may depend upon the terms and conditions submitted by contractors. Twenty-four hour service will be available, with trains departing every five or ten minutes during peak periods. Costs of the tunnel are reviewed.

Publicatie aanvragen

2 + 6 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
A 3968 (In: A 2366 S)
Uitgave

In: Highway Research Record, No. 234, 1968, p. 37-43, 11 FIG, 1 REF

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.