Conflicting interests in cycleway design.

Auteur(s)
Sturrock, A.
Jaar
Samenvatting

Cycling provides a healthy sustainable means of transport. As part of the New South Wales Government's Action for Bikes, BikePlan 2010, the Roads and Traffic Authority (RTA) commissioned the design and construction of a cycleway approximately 8 kilometres through Sydney's lower north shore to form part of a regional cycle route in Sydney's overall bicycle network, as part of a major highway project. The provision of a cycleway generated considerable interest from the general community, cyclist groups, community groups, and local councils. At times the views of these parties have differed and have been in conflict with the project requirements. In addition, the corridor provided for the cycleway had significant constraints. Some of the issues addressed through the design process included: path type, path nomenclature, sight distance and path intersections, path gradient, road intersection treatments, pavement and surfaces, signage, fencing, and lighting. This paper discusses the issues and design outcomes this project addressed to assist designers and constructors in planning and designing future cycleways. Information is also relevant for those involved with the preparation of guidelines outlining areas to be investigated further. (a) For the covering entry of this conference, please see ITRD abstract no. 0612AR242E.

Publicatie aanvragen

5 + 3 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 38944 (In: C 38917 CD-ROM) /72 /73 / ITRD E214523
Uitgave

In: Research into practice : proceedings of the 22nd ARRB Conference, Canberra, Australia, 29 October - 2 November 2006, 15 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.