The contractual implementation of CIE 12/2 into a major interchange and motorway widening scheme.

Auteur(s)
Williams, E.D. & Grundy, J.T.
Jaar
Samenvatting

By reason of the vast increase in vehicular traffic to a peak of 7500 vehicles per hour on a four lane dual carriageway, the National Transport Commission of RSA allocated funds for widening and also limited funds for the lighting. The new road surfaces were specified. The complete electrical and lighting installation had to be designed to provide an economical capital and maintenance cost system and planned to proceed in conjunction with the civil road alteration works.

Publicatie aanvragen

4 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
B 22665 (In: B 22651 a) /85/ IRRD 273652
Uitgave

In: Proceedings of the 20th Conference Session of the International Commission on Illumination CIE, Amsterdam, 31 August-8 September 1983, Volume 1, p. E45/1-2, 1 tab.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.