De grens tussen zeggen en doen.

Auteur(s)
Poelstra, E.H. & Sterenburg, B.J.
Jaar
Samenvatting

A first limitation in traffic and transportation planning is due to methodological imperfections, resulting in a gap between what is promised and what is actually laid down in the plans. A second factor limiting the output of traffic and transportation planning is the lack of interaction with related policy issues. Land use policy, changes in society, economic developments and financial aspects are the most important of them. The importance of the mobility problem urges both an internal methodological improvement over and above the normal effort, and a more comprehensive attitude towards related issues, beyond the regular boundaries. This is an essential condition for the borderline between saying and doing in traffic and transportation planning to dissolve. (A)

Publicatie aanvragen

6 + 6 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 2427 (In: C 2414 [electronic version only]) /72 / IRRD 862289
Uitgave

In: Colloquium Vervoersplanologisch Speurwerk CVS 1993 : grenzen aan de vervoersplanologie, Rotterdam, 26 november 1993, deel 1, p. 223-238

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.