Deployment path for a "Route automatisee" project in a French metropolitan transportation context.

Auteur(s)
Pacalet, R. & Blosseville, J.M.
Jaar
Samenvatting

Deploying automated driving constitutes a problem of high complexity and one of a key subject whose solution decides the realism of a precise project plan. However, it should be solved because the only photography of the final stage could not convince of the whole project feasibility. In order to provide information to the various potential promoters of the "Route automatisee" Project, it is necessary to know the evolution stages of this system in time, space and the performances. The study encompasses identification of the principal stakeholders, determination of their main needs, their expectations and significant characteristics. At the final stage all new infrastructures are dedicated to automated control. For the covering abstract see ITRD E114174.

Publicatie aanvragen

5 + 3 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 24560 (In: C 22454 CD-ROM) /72 /90 / ITRD E115713
Uitgave

In: From vision to reality : proceedings of the 7th World Congress on Intelligent Transportation Systems ITS, Turin, Italy, 6-9 November 2000, 9 p., 5 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.