Design and Construction of a Pervious Concrete Pavement.

Auteur(s)
Raymond, C. Lane, B. Bianchin, M. Senior, S. & Titherington, M.
Jaar
Samenvatting

The Ontario Ministry of Transportation (MTO) designed and constructed its first pervious concrete pavement in 2007. The pervious concrete pavement serves as a commuter parking lot located adjacent to Highway 401. The final design consists of 240 mm of pervious concrete over 100 mm of open graded clear stone, over 200 mm of granular base material, over select subgrade material, over silty sand subgrade. Pervious concrete pavements provide many environmental benefits and are deemed a stormwater management best practice. These benefits may be offset by concerns with winter durability and the potential for clogging, especially with traditional winter maintenance. The Contractor elected to use a Bid-Well bridge deck finishing machine for placing the majority of the pervious concrete pavement. A Razorback screed (i.e. air driven steel truss) was used to construct the last section of the pavement. This paper presents the design considerations and summarizes the construction observations and lessons learned. Laboratory performance data for the pervious concrete pavement are also presented along with a description of proposed water quality monitoring. For the covering abstract of this conference see ITRD number E216597.

Publicatie aanvragen

2 + 5 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 44365 (In: C 44349 CD-ROM) /22 /26 /52 / ITRD E217368
Uitgave

In: Transportation: a key to a sustainable future : proceedings of the 2008 Annual Conference and Exhibition of the Transportation Association of Canada (TAC), Toronto, Ontario, from September 21 to 24, 2008, 17 p., 6 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.