DESIGN PROVISIONS FOR A REPLACEABLE SEGMENTAL BRIDGE DECK

Auteur(s)
STELMACK, TW TRAPANI, RJ
Samenvatting

A major precast concrete segmental bridge located in glenwood canyon, colorado, was mandated by the federal highway administration and the colorado department of highways to have the capability of full depth deck replacement. a simple procedure for replacement of the top slab of the box girder was developed and integrated into the final design of the structure. although erected by the balanced cantilever method, no compromises were required of the design and replacement capability was satisfied with little initial cost impact to the construction of the viaduct. the deck replacement procedure, the special design features and the analysis method and results are presented. it is concluded that full depth deck replacement capability is economically feasible for a precast segmental bridge, ensuring the owner of a durable concrete structure for many years of service. this paper appears in transportation research record no. 1290, third bridge engineering conference, march 10-13, 1991, denver, colorado, volume 1.

Publicatie aanvragen

15 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
I 847215 IRRD 9204
Uitgave

TRANSPORTATION RESEARCH RECORD WASHINGTON D.C. USA 0361-1981 SERIAL 1991-01-01 1290 PAG:77-92 T1

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.