Development and application of transit signal priority implementation guidelines : a proven process.

Auteur(s)
Stewart, R. & Corby, M.
Jaar
Samenvatting

The purpose of this paper is to describe the development of the Transit Signal Priority (TSP) Guidelines, and the lessons learned from the application of the guidelines for four transit systems. The TSP Implementation Guidelines were developed as a method to quickly assess a large number of signalized intersections and apply a systemic process to arrive at an initial suite of TSP parameters for implementation. These TSP parameters can later be adjusted through system operation experience. The overall TSP design process has two streams of activities, specifically TSP equipment procurement and TSP parameter design, which will culminate in TSP system installation. For the covering abstract of the conference see ITRD number E211521.

Publicatie aanvragen

11 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 38384 (In: C 38346 CD-ROM) /72 / ITRD E211555
Uitgave

In: Transportation without boundaries : proceedings of the 2006 annual conference and exhibition of the Transportation Association of Canada TAC, Charlottetown, Prince Edward Island, Canada, September 17-20, 2006, 19 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.