Development of rapid crossing methods for over-bridge crossing system.

Auteur(s)
Mishima, Y. Minada, R. & Yamamoto, T.
Jaar
Samenvatting

In recent Japanese urban restoration programs, the resolution of serious traffic congestion at surface crossing points has become more important for both automobile and railway crossings. The over-bridge crossing system is very effective for the solution of traffic congestion, but it sometimes brings about more congestion owing to traffic restrictions, and also the environmental deterioration of surroundings and these can be reduced by realizing a significant reduction in the construction period. The Japan Bridge Association (JBA) members have further studied and developed, on the basis of social needs," Rapid Construction Methods for Over-bridge Crossing System" which realizes the installation of an over-bridge at surface traffic congestion points in a short construction period. In this report, the outline of rapid construction methods developed by the JBA members, is introduced first, and then two construction examples are discussed. (a) For the covering entry of this conference, please see ITRD abstract no. E214938.

Publicatie aanvragen

4 + 14 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 46586 (In: C 46558 CD-ROM) /24 /72 / ITRD E214865
Uitgave

In: On the road to the future : 12th REAAA conference, Philippines, 2006 technical papers, Philippine International Convention Center (PICC), Manila, November 20-24, 2006, 11 p., 2 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.