Dynamische openbare verlichting (DYNO). Fase 2: Het vastleggen van een voorlopig schakelregime. In opdracht van het Directoraat-Generaal Rijkswaterstaat, Adviesdienst Verkeer en Vervoer AVV.

Auteur(s)
Hogema, J.H. & Kaptein, N.A.
Jaar
Samenvatting

The Dutch Ministry of Transport, Public Works and Water Management intends to provide different levels of road lighting on motorways. Depending on the traffic situation optimal levels of lighting will be provided. The lighting level is changed dynamically on basis of ambient light level, traffic intensity and weather conditions. In order to determine the effects of dynamic road lighting, it will be installed on a presently unlit section of the A12 motorway. This report describes phase 2 of the 'dynamic road lighting' research project. Based on the results from phase 1 of this project, a temporary light switching schedule was developed. For abstracts of the phases 1, 3 and 4 see ITRD 890426, E203717 and E203718, respectively. See also ITRD D335635.

Publicatie aanvragen

3 + 3 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 16459 [electronic version only] /85 / ITRD E203716
Uitgave

Soesterberg, TNO Technische Menskunde TM, 1996, 28 p., 36 ref.; Rapport TNO-TM 1996 C-005

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.