Dynamische openbare verlichting (DYNO) : voorlopige resultaten. In opdracht van het Directoraat-Generaal Rijkswaterstaat, Adviesdienst Verkeer en Vervoer AVV.

Auteur(s)
Kaptein, N.A. & Hogema, J.H.
Jaar
Samenvatting

The Dutch Ministry of Transport, Public Works and Water Management plans to dynamically adjust the amount of road lighting depending on the prevailing conditions. In all circumstances a sufficient amount of road lighting will be provided, given traffic and weather conditions, whereas the road will not be unnecessarily highly lit. Under contract with the Ministry's Transport Research Centre, a field test is carried out to evaluate the effect of such dynamic road lighting in traffic behaviour and road safety. First on the basis of an analysis of the road scene a temporary switching schedule was developed. This switching schedule was used in the field test. This report describes the preliminary results of the evaluation of the field test. (A)

Publicatie aanvragen

10 + 4 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
20010143 ST [electronic version only]
Uitgave

Soesterberg, TNO Technische Menskunde TM, 1998, 56 p., 17 ref.; Rapport TNO-TM 1998 C-001

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.