Effect of increasing the speed limit and associated penalties for heavy vehicles on the Eyre highway.

Auteur(s)
Maisey, G.E.
Jaar
Samenvatting

In an effort to achieve greater compliance with the speed limit, traffic fines and demerit point penalties were substantially increased at the same time for drivers of heavy vehicles apprehended for exceeding the speed limit. The results of the study suggest that the proportion of semitrailers travelling at high speeds on the Eyre Highway is less following the changes in legislation. It is suggested that the current speed limit for heavy vehicles in the Eyre Highway remain at 90 kilometres per hour provided that the increased penalties remain for transgression of this limit.

Publicatie aanvragen

2 + 13 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
B 23027 /73/82/ IRRD 271946
Uitgave

Perth, Police Department, Traffic Licensing & Services Centre, 1983, 18 p., tab., ref.; Research Report 83/1

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.