Effects of taper length on traffic operations in construction zones. Final report.

Auteur(s)
Graham, J.L. & Sharp, M.C.
Jaar
Samenvatting

The study dealt with a proposed taper length formula that yields shorter tapers at design speeds below 60 mph than the existing formula, L=WS. Speed, erratic manoeuvres, conflicts and encroachment data were collected at four sites, day and night, covering a variety of design speeds and taper lengths. The analyses of the collected data do not implicate the proposed taper lengths as being more hazardous. Erratic-manoeuvre and slow-moving conflicts rates were never greater with the proposed taper than with the standard or existing taper. There was no indication that the proposed taper lengths resulted in a greater number of passenger vehicle or truck encroachments on adjacent lanes. (Author/publisher)

Publicatie aanvragen

2 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
B 14451
Uitgave

Washington, D.C., U.S. Department of Transportation DOT, Federal Highway Administration FHWA, Offices of Research and Development, 1977, V + 38 p.; FHWA-RD-77-162

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.