Environmental and economic benefits of the full depth reclamation process in the urban context.

Auteur(s)
Johnston, A.G. Hogeweide, B. & Bellamy, M.
Jaar
Samenvatting

In 2000, The City of Lethbridge in partnership with the "Alliance for Lethbridge Infrastructure Services (ALIS)" consulting team commenced planning and design for the upgrading of Mayor Magrath Drive from a four-lane to a six-lane divided urban cross-section. Consideration of several pavement reconstruction alternatives led to the selection of a Full Depth Reclamation (FDR) construction strategy for the project. For this project it is estimated that approximately 25,000 cu.m. of "waste" material was reused. The FDR process reduced quantities of imported construction materials and resulted in an estimated 8000 less truck trips to, and from, the construction site. The FDR strategy resulted in significant capital cost savings, and allowed construction to occur on a key transportation corridor within the City of Lethbridge without major disruption to traffic flow and business access. This paper describes the process whereby the FDR alternative was selected, the steps taken to address the relative inexperience with this type of construction in Western Canada, as well as design and construction issues. The relative economics of the FDR strategy compared to conventional reconstruction alternatives are also discussed.

Publicatie aanvragen

1 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 36398 (In: C 36376 CD-ROM) /52 /15/ ITRD E211288
Uitgave

In: The transportation factor : proceedings of the 2003 annual conference and exhibition of the Transportation Association of Canada TAC, St. John's, Newfoundland and Labrador, Canada, September 21-24, 2003, 20 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.