This research compares two interchange types, the Tight Urban Diamond Interchange (TUDI) and the Four Phase Single Point Urban Interchange (40SPUI). The 40SPUI is referred to in this report as a Single Point Urban Interchange with Frontage Roads (SPUI/F). The objectives of this research were to: (1) evaluate the SPUI/F based on available accident data and conflict analysis techniques, right-of-way and construction costs, and operating efficiency; (2) compare the performance of the SPUI/F and the TUDI; (3) evaluate current SPUI/F design assumptions and operation and recommend design and/or operational changes to enhance performance; and (4) evaluate the interchange form selection (pre-design) process and recommend changes where appropriate. The research found no significant difference in the safety aspects of the two interchange types. The SPUI/F generally did not perform as well operationally as the TUDI, with increased SPUI/F delay as the distance between frontage roads increased.

Publicatie aanvragen

9 + 3 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 32266 [electronic version only] /20 / ITRD E825998
Uitgave

Phoenix, AZ, Arizona Department of Transportation, 2002, 200 p., 45 ref.; FHWA-AZ01-501

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.