EVALUATION OF THE PERFORMANCE OF BONDED CONCRETE OVERLAY ON INTERSTATE HIGHWAY 610 NORTH, HOUSTON, TEXAS

Auteur(s)
KOESNO, K MCCULLOUGH, FF
Samenvatting

The objective of the study was to evaluate the performance of the bonded concrete overlay project on ih 610 north in houston and implement the findings in other studies on bonded concrete overlay. Theperformance of the bonded concrete overlay was monitored on ten experimental sections selected from the 3.5-Mi project and ranging from400 to 600 feet long. Periodic field measurements were conducted, and an assessment of overlay pavement life was made. The resulting conclusions and recommendations were to be used by the texas state department of highways and public transportation to design overlays forrehabilitation programs on continuous reinforced concrete pavement (crcp). This paper appears in transportation research record no. 1196, Pavement evaluation and rehabilitation.

Publicatie aanvragen

6 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
I 829183 IRRD 9005
Uitgave

TRANSPORTATION RESEARCH RECORD WASHINGTON D.C. USA 0361-1981 SERIAL 1988-01-01 1196 PAG:201-211 T10

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.