Evaluations of the Effects of TDM and road improvements on traffic flow in the TOYOTA H.Q. area.

Auteur(s)
Ikegami, T. & Ishikawa, S.
Jaar
Samenvatting

An attempt to ease the traffic congestion around the headquarters of Toyota Motor Corporation is described. Since 2002, traffic congestion factors have been analysed by using traffic simulation around the headquarters. Based on the analysis, Toyota Motor Corporation has conducted TDM (transportation demand management) programs. In addition, in collaboration with Toyota City and local communities, the TDM field test was conducted in 2004. In addition, related governments executed several road improvements in 2005. The results were evaluated, confirming the validity of the countermeasures for easing the traffic congestion. For the covering abstract see ITRD E134653.

Publicatie aanvragen

1 + 12 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 41181 (In: C 40997 CD-ROM) /72 /73 / ITRD E134981
Uitgave

In: Proceedings of the 13th World Congress and Exhibition on Intelligent Transport Systems (ITS) and Services, London, United Kingdom, 8-12 October 2006, 8 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.