Evolutions in urban transport planning process.

Auteur(s)
Wadhwa, L.C.
Jaar
Samenvatting

The traditional urban transport planning (UTP) process dating back to the 1950's was based on the premise that capacity requirements of urban transport networks should be dimensioned to meet predicted demand. The modelling was biased in favour of predicting an ever-increasing share of private car trips. The ever-expanding urban road transport system, has been accompanied by high community costs in road fatalities and injuries, congestion, massive capital investment and environmental degradation. Transport systems management since late 1970's stressed better use of existing systems, developing short-term projects for transport system improvements and managing travel demand. The emphasis is on sustainable urban transport. This has involved a remarkable shift towards the treatment of non-car modes in the planning process. Revival of public transport and development of cycling strategies are given major emphasis in the process. This paper highlights the salient shifts in objectives, processes and the current thinking behind urban transport system development. Examples from major Australian cities are cited. (Author/publisher) For the covering entry of this conference, please see ITRD abstract no. E210528.

Publicatie aanvragen

8 + 8 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 29094 (In: C 29076 CD-ROM) /72 /10 / ITRD E210546
Uitgave

In: CAITR-2003 : [proceedings of the] 25th Conference of the Australian Institutes of Transport Research, University of South Australia, Transport Systems Centre, 3-5 December 2003, 10 p.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.