Forecasting highway construction staffing requirements.

Auteur(s)
Taylor, T.R.B. & Maloney, W.F.
Jaar
Samenvatting

Adequate construction staffing is critical for performance of highway construction projects. The variable nature of these projects, however, can make it difficult to estimate construction staff requirements for both the short and long term. This study gathered information on the methods being used at highway transportation agencies to forecast staffing requirements. These methods are diverse and range from simple heuristics based on generic project types to multi-variate regression models developed from historical project data. Information for this study was acquired through a literature review, surveys of state transportation agencies, and site visits to non-state agencies. (Author/publisher)

Publicatie

Bibliotheeknummer
20141323 ST [electronic version only]
Uitgave

Washington, D.C., Transportation Research Board TRB, 2013, 75 p., 15 ref.; National Cooperative Highway Research Program NCHRP, Synthesis of Highway Practice ; Report 450 / Project 20-05 (Topic 43-13) - ISSN 0547-5570 / ISBN 978-0-309-27096-0

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.