Samenvatting
In the framework of the BREV projects the Victor de Stuersstraat in the city of Maastricht was redesigned and reconstructed. A before and after study is used to evaluate the reconstruction. The car traffic has decreased with 30 to 50%. Moped traffic with 30 to 35%. The speed level decreased and became more steady. The noise level decreased and the parking situation has improved.