Highway 407 ETR : express toll route geoengineering management innovative procedures.

Auteur(s)
Prasad, G.D. & Guistini, D.
Jaar
Samenvatting

The design and construction of Highway 407 ETR - Express Toll Route in Toronto required innovative geotechnical management to fast track design and construction to meet the tight construction schedule. The Geotechnical Manager and Quality Control Manager had to work in an integrated manner to develop procedures as the design progressed so that approvals could be obtained on time. The geotechnical management of the project included advance planning and identification of problems, value engineering, innovative applications and constructability reviews. Site specific solutions had to be found to meet limitations of time and budget. Innovative solutions for various elements of the project including materials, constructability and design from geotechnical perspective are described in this paper. Lack of adequate geotechnical information was compensated by close monitoring of the work during construction. Cooperation between design, construction and QA/QC resulted in timely solutions to difficult situations. (A)

Publicatie aanvragen

6 + 8 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 13046 (In: C 13012 CD-ROM) /21 / IRRD 873005
Uitgave

In: Proceedings of the 13th International Road Federation IRF World Meeting, Toronto, Ontario, Canada, June 16 to 20, 1997, p.-

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.