The paper describes the design of traffic management for the reconstruction and widening to four lanes of the M25 between Junction 10 at Wisley and Junction 13 at Wraysbury. It covers the design development and the lessons learned during its implementation over 15 months. The paper includes: a brief description of the works; the considerations in the consultant's brief, L G Mouchel and Partners, affecting the design of the traffic management systems; a review of the alternative systems considered; a description of the scheme adopted; and an assessment of the scheme's performance with particular reference to accidents and capacity, lessons learned and guidance for future projects.

Publicatie aanvragen

3 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 770 (In: C 766 [electronic version only]) /52 /60 / IRRD 844246
Uitgave

In: Traffic management and road safety : proceedings of seminar G (P334) held at the 18th PTRC European Transport and Planning Summer Annual Meeting, University of Sussex, England, September 10-14, 1990, p. 41-54, 4 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.