An integrated infrastructure management system.

Auteur(s)
Harper, W.V. & Majidzadeh, K.
Jaar
Samenvatting

This paper describes an integrated infrastructure system (with emphasis on pavement and bridge management systems) that allows cost minimization or benefit maximization. It integrates separate infrastructure systems so that management may optimally allocate scarce resources across the combined systems. Fuzzy set theory is used in these optimizations to better address the desirability or undesirability of the condition states used to categorize the infrastructure segments modeled. Both steady-state and multi-year models are part of this system. The full mathematical structure of the simpler steady-state problem is presented, and sample multi-year output showing the integrated budgets is given. (A)

Publicatie aanvragen

3 + 3 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 5401 (In: C 5396) /10 /61 / IRRD 863183
Uitgave

In: Proceedings of the 1994 International Road Federation IRF Conference and Exposition "Roads to the 21st century : a key to competitiveness", Calgary, Alberta, July 3-7, 1994, Volume 3, p. B53-B65, 11 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.