Jakarta mass rapid transit project : an economic review.

Auteur(s)
Santosa, W. & Basuki, T.
Jaar
Samenvatting

In this paper, the rationale for the Jakarta Subway Project is explored. The discussion includes the need to have a subway transportation system, the benefits to the city, and the cost to build it. It is partly true that the subway system, which has a great capacity to move people, is the only system, which can be used to solve chaotic road conditions in Jakarta, since no other urban transportation mode has a bigger capacity to move people than this one. However, the financial and economic viability associated with this project need to be justified carefully. (Author/publisher) For the covering entry of this conference, please see ITRD abstract no. E208431.

Publicatie aanvragen

17 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 27059 (In: C 26913 CD-ROM) /72 / ITRD E209407
Uitgave

In: Transport: our highway to a sustainable future : proceedings of the 21st ARRB and 11th REAAA Conference, Cairns, Queensland, Australia, 18-23 May 2003, 20 p., 15 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.