An on-line procedure for estimating current capacity. Commissioned by the Dutch Ministry of Transport, Public Works and Water Management, Transportation and Traffic Research Division.

Auteur(s)
Arem, B. van & Vlist, M.J.M. van der
Jaar
Samenvatting

The development and off-line testing of a procedure for estimating the current capacity at a motorway cross-section are described, the adjective 'current' referring to prevailing roadway and weather conditions. The procedure is based on the combination of an on-line estimation of the 'current' Fundamental Diagram', with the maximal occupancy of a loop detector that may be achieved at a cross-section under free-flowing conditions. The on-line procedure itself is developed and tested for different sets of weather conditions. A special version of the procedure is presented which is suitable for road-side implementation.

Publicatie aanvragen

1 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
C 552 [electronic version only] /71 /72.2 / IRRD 853144
Uitgave

Delft, Netherlands Organization for Applied Scientific Research TNO, Institute of Spatial Organization INRO TNO, Traffic and Transportation Unit, 1992, 74 + VIII p. 15 ref.; TNO-Policy Research ; Report INRO-VVG 1992-17

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.