Long term performance of an anchored earth wall at Otley : 1984 to 1994.

Auteur(s)
Brady, K.C. Barratt, D.A. & Jafar, M.I.
Jaar
Samenvatting

An 86 metre long wall, having a maximum height of 6 metres, was constructed using the TRL Anchored Earth system in 1984 as part of the A660 Otley bypass. The performance of the wall has been monitored from the outset and this report presents and discusses the site data collected in the ten years following the end of construction. The data show that the wall is stable and will provide satisfactory service for its intended design life of 120 years. (A)

Publicatie

Bibliotheeknummer
C 4612 [electronic version only] /24 / IRRD 871896
Uitgave

Crowthorne, Berkshire, Transport Research Laboratory TRL, 1995, 21 p., 8 ref.; Project Record ; E474A/BG / TRL Report ; No. 132 - ISSN 0968-4107

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.