A model for the economic evaluation of rural highway reconstruction projects.

Auteur(s)
Abrams, K.R. & Tindall, J.I.
Jaar
Samenvatting

The model is concerned with the determination of road user vehicle and time costs. Other cost estimation is treated in less detail. The computer model can be used to determine the net present value of proposed reconstruction projects which are competing for budget allocations. It is found that the results were insensitive to many factors but that traffic volumes in particular should be estimated accurately. A discussion is added.

Publicatie aanvragen

10 + 0 =
Los deze eenvoudige rekenoefening op en voer het resultaat in. Bijvoorbeeld: voor 1+3, voer 4 in.

Publicatie

Bibliotheeknummer
B 7118 (In: B 3602 S [electronic version only]) /10/ IRRD 210888
Uitgave

In: Proceedings of the 6th Conference of the Australian Road Research Board ARRB, Canberra, 1972, Volume 6, Part 2, p. 87-113, 3 graph., 8 tab., 28 ref.

Onze collectie

Deze publicatie behoort tot de overige publicaties die we naast de SWOV-publicaties in onze collectie hebben.